Milestone/m2 targets #43

Merged
gronod merged 2 commits from milestone/m2-targets into develop 2026-09-09 00:10:48 +01:00
Owner
No description provided.
gronod added 2 commits 2026-09-09 00:10:42 +01:00
Stage 1 targen: typed TargenConfig + argv builder (-v -d 2/4, -f, -e,
-B, optional advanced flags, CMYK-only -l, never -u), ArgyllRunner over
ProcessManager, Stage1View with disk-gated Generate.

Issue 8: Open Existing resume — .ti1 → Stage 2, .ti2 → Stage 3 shell
with persistent "Resumed from .ti2" banner, sibling-.ti1 gate.

Stage 2 printtarg: PrinttargConfig/args (-v -u, -i, -p, -R 1 default,
-r raster, -t/-T DPI), Stage2View with instrument/page/DPI/label
controls, CM warning, stubbed print panel.

Issue 10: pretty-manifest JSON parsing, host-side TIFF→PNG gallery
previews, per-page stubbed print, failure stays on stage.

Issue 11: typed ProfilingPreset schema with legacy CustomPreset
migration, four built-ins, save/manage/import/export UI, DPI binding.

Tests: 124 Core tests (Swift Testing) + 11 Milestone2UITests (XCTest)
with committed fixture sidecars — all green on arm64+x86_64 universal
build. No hardware, no downloads.

Also: ProcessError LocalizedError conformance; accessibilityElement
.contain on container identifiers so child AX ids survive.

Generated with [Devin](https://devin.ai)

Co-Authored-By: Devin <158243242+devin-ai-integration[bot]@users.noreply.github.com>
gronod merged commit 71172d751a into develop 2026-09-09 00:10:48 +01:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: gronod/iccery-v2-mac#43