docs(print): native spool documentation update + issue #201 analysis (#201 Phase 6) #208

Merged
gronod merged 1 commits from feat/201-docs into milestone/m12-native-spool 2026-09-17 18:02:13 +01:00
Owner

Phase 6 of #201: documentation update for the native NSPrintOperation spool path and issue analysis.

Phase 6 of #201: documentation update for the native NSPrintOperation spool path and issue analysis.
gronod added 1 commit 2026-09-17 18:02:06 +01:00
- Create docs/issue-printer-quality-ignored.md: lifecycle trace, ticket-loss and override-inversion root causes with file:line evidence, dismissed argv tokenisation hypothesis, locked D1-D13 table.
- docs/11: retitle walkthrough to UI click to NSPrintOperation; replace build_lp_args/print_target with the S1-S14 native-spool trace; add layers 5' (Quartz vocabulary) and 7 (ticket serialise/restore); mark lp flag table and macOS test list historical v1.
- docs/14: decision table rows (Spool, ColorSync ticket, Geometry, Interpolation, AirPrint) marked adopted in v2.0 via #201; note section 7 Quartz vocabulary now live in ICCery proper.
- AGENTS.md: spooler documented in app target (D1); new Print spool section (lp eradicated, parsers retained per D4, ICCERY_TEST_SPOOL_LOG seam); ColorSync SPI rule replaced by the D2 single-path dual-vocabulary rule.
- Eradication sweep: label remaining lp/LpArgs references historical v1 in docs/10, docs/13, docs/25, docs/26; drop deleted LpArgs from README.
gronod merged commit 60f3aa3991 into milestone/m12-native-spool 2026-09-17 18:02:13 +01:00
gronod deleted branch feat/201-docs 2026-09-17 18:02:14 +01:00
Sign in to join this conversation.
No Reviewers
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: gronod/iccery-v2-mac#208